What is the Board´s position on how the illegal digging for gold and other minerals in the Panguna mine area can be stopped and also how -once mining has officially been resumed by BCL- the environmental damages caused by the use of quicksilver can be reduced?
ANSWER of BCL:
The Board’s main concern is for the environment and
the safety of the people involved but without access to
the area the company cannot assess the situation or
takes steps to mitigate problems.
6.
Could you please let us know if the company has a „master plan“ of how the company will remedy all the environmental damages that resulted from the operation of the Panguna mine prior to its closure in 1989? How are you going to address these environmental issues? Have you already conducted discussions and studies on a „best practice“ solution with companies specialised in this area of business? What is the current cost estimate for all actions needed in this context? Are these costs included in the 1 to 1.5b USD estimate for the re-opening of the mine, with this 1 – 1.5 billion USD the figure most often rumoured to be the cost of re-opening the Panguna mine.
ANSWER of BCL:
I have made it publicly known over a number of years
that the company would like to undertake an
environmental and safety audit of the mine site. Such
an audit is be an essential pre-requisite to future onsite
development activities. The company has not been
permitted access for this or any other purpose.
In studies currently being planned will look at “best
practice” environment options and landowners and
government agencies will be consulted to determine
what their preferred outcomes are.
7.
Has BCL secured the availability of all the equipment needed for the re-opening and operation of the mine? Do contracts/letter of intents with manufacturers already exist? Would Rio Tinto be in the position to make all required equipment available in time for the re-opening?
ANSWER of BCL:
BCL has not secured any new equipment that might be
needed to reopen the mine. At this stage it does not
know what equipment it might need. There is a lot of
work to be done on establishing the optimum mine
plan. There is also the need to consult extensively with
landowners and regulators once mine plan options have
been developed.
I cannot speak for Rio Tinto or any other shareholder.
8.
The World Bank has made it clear that it is in their interest to support the development in the region. Have there been talks between BCL and the World Bank? If so, what has been discussed and have agreements been made that you could let us know about, today?
ANSWER of BCL:
BCL and the World Bank consult from time to time on a
range of matters but there are no agreements between
the Bank and BCL.
9.
Has the Board considered to purchase the Panguna area from the Government and to establish a free-trade zone within it?
ANSWER of BCL:
No.